Huron Valley Electric (HVE) delivered full design-assist electrical services for the $40 million renovation and expansion of Strong Hall, a central component of Eastern Michigan University’s Science Complex. As Construction Manager, Clark Construction led the overall design-assist effort.
The project transformed a 1957-era academic building into a modern STEM learning environment, combining a 90,000-square-foot renovation with a 15,000-square-foot addition. The result is a flexible, technology-forward facility designed to support evolving instructional needs while meeting LEED Silver standards.
Strong Hall required a complete reset without disrupting its role at the center of campus life. The project involved demolition down to the structural frame, down to the concrete structure, followed by a full rebuild of all major systems, while maintaining safety, access, and coordination across a dense campus environment.
Eastern Michigan University
2018
$4,800,000
Key challenges included:
Every decision had to balance performance, flexibility, and long-term operational efficiency. HVE led the complete electrical scope from design through commissioning, acting as a true design-assist partner responsible for design, engineering, construction, installation, and commissioning of the electrical systems.
Scope included:
The team also supported lifecycle cost analysis, constructability reviews, BIM coordination, and full project commissioning, as well as schedule evaluation and construction phase management.
One standout feature was the installation of custom “light constellations”, where LED fixtures were precisely laid out 30 feet in the air to replicate star patterns, requiring exact coordination between digital modeling and field execution.
HVE’s role extended far beyond installation. Through early involvement, the team helped shape the project’s direction, identifying cost savings, improving constructability, and optimizing system performance.
Key contributions included:
HVE also implemented advanced lighting controls, including daylight harvesting, occupancy sensors, and centralized emergency lighting testing, improving both energy performance and operational efficiency while contributing to improved workflow, safety, quality, and reduced job site waste through collaborative coordination with all project stakeholders. The project delivered a modern academic environment built for flexibility, efficiency, and long-term performance.
Upon completion, Strong Hall marked the third and final phase of Eastern Michigan University’s Science Complex and now houses the Departments of Geography/Geology, Physics, and Astronomy.
The building now supports collaborative learning, advanced research, and dynamic classroom configurations. Strong Hall went from an outdated academic facility to a modern, high-performance learning environment at the core of EMU’s campus.